Sunday, 30 November 2008

Rendering the back

The outside of the house is being re-rendered

Old door

Inside the extension with the old doorway into the pantry now fully blocked up



Some of the electric sockets have been installed, the rest will be in this week

New Door

What's behind the door?



The new downstairs toilet (waiting to be installed once the floor is dry)

Sunday, 23 November 2008

Taking shape

More pictures of the new floor screed:



Floor Screed

On saturday the floor screed was laid:



Kitchen and Toilet

Electrics and plumbing waiting for the new kitchen



The location of the new downstairs toilet - new wall and plumbing in place:

Saturday, 22 November 2008

Plastered

Plasterboard gone up on some walls and the electrics have gone in





Knocked-out

All the walls went and the inside of the extension began to take shape





Give me strength

A couple of weeks ago the walls came down and the beams went in to support the house:



Saturday, 1 November 2008

Pillar up further

The old kitchen wall is coming out



and the pillar has gone up even further

Pillar

The old kitchen door has been moved round to the front so the extension is now completely sealed and the supporting pillar has started going up

New Kitchen

The old kitchen has gone



And reinstalled elsewhere

Steel is real

The house will be made of girders soon.