Saturday, 6 December 2008

More Floor Screed

The wooden floor arrived on friday. Before it can be put down the whole downstairs has to have a 2 part latex screed over the old floor tiles. So far its gone down in the old kitchen area. Next week it will go down throughout the hall.

Sunday, 30 November 2008

Rendering the back

The outside of the house is being re-rendered

Old door

Inside the extension with the old doorway into the pantry now fully blocked up



Some of the electric sockets have been installed, the rest will be in this week

New Door

What's behind the door?



The new downstairs toilet (waiting to be installed once the floor is dry)

Sunday, 23 November 2008

Taking shape

More pictures of the new floor screed:



Floor Screed

On saturday the floor screed was laid:



Kitchen and Toilet

Electrics and plumbing waiting for the new kitchen



The location of the new downstairs toilet - new wall and plumbing in place: