The extension
This blog documents the rise of our extension
Sunday, 30 November 2008
Rendering the back
The outside of the house is being re-rendered
Old door
Inside the extension with the old doorway into the pantry now fully blocked up
Some of the electric sockets have been installed, the rest will be in this week
New Door
What's behind the door?
The new downstairs toilet (waiting to be installed once the floor is dry)
Sunday, 23 November 2008
Taking shape
More pictures of the new floor screed:
Floor Screed
On saturday the floor screed was laid:
Kitchen and Toilet
Electrics and plumbing waiting for the new kitchen
The location of the new downstairs toilet - new wall and plumbing in place:
Saturday, 22 November 2008
Plastered
Plasterboard gone up on some walls and the electrics have gone in
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Pictures
See all extension photos here
Blog Archive
▼
2009
(7)
▼
June
(1)
Bike Ride
►
April
(3)
►
February
(2)
►
January
(1)
►
2008
(69)
►
December
(20)
►
November
(13)
►
October
(25)
►
September
(11)
Subscribe To My Blog
Posts
Atom
Posts
All Comments
Atom
All Comments
Cycling Weekly: Cycling News
Loading...
BikeRadar.com
Loading...
Followers